1. Hexy 2 Started: December 2013.
Current Status: Widening it slightly, just 4 rows, and the top will be finished.
Plan: No fixed deadline for finish, but would like to finish by the summer time.
2. The Weekender Started: Spring 2013
Current Status: Taken back apart. Reduce size of the base, re-sew together and then fix the lining
Plan: Just finish it, and never, ever talk about sewing another!
3. Plus Quilt Started: Summer 2013
Current Status: Central section completed, need to make lots more pluses!
Plan: Keep going
4. Stitch Tease House Quilt 2
Started: Nov 2013
Current Status: Just needs to be quilted and bound
Plan: Easy finish, get it done!
5. Simply Solids Quilt
Started: August 2013
Current Status: Just blocks
Plan: Make into a quilt/picnic throw for summer in the garden
6. Star/Bright Sampler Blocks
Started: January 2013
Current Status: Just blocks
Plan: Piece into a quilt!
7. Hand Hoop
Started: Early 2013
Current Status: Needs hoop finishing off
Plan: Finish and hang!
8.Crochet Blanket
Started: End of 2012
Current Status: All blocks finished, need joining and lining
Plan:Sew them together and get them made into a little blanket
Started: End of 2012
Current Status: All blocks finished, need joining and lining
Plan:Sew them together and get them made into a little blanket
9. Christmas Quilt 1
Started: December 2014
Current Status: All pieced, just needs basting, quilting and binding
Plan: Finish this quarter
Current Status: All pieced, just needs basting, quilting and binding
Plan: Finish this quarter
10. Christmas Quilt 2
Started: December 2014
Current Status: Strips pieced, need sewing together, basting, quilting and binding.
Plan: Finish this quarter.
Current Status: Strips pieced, need sewing together, basting, quilting and binding.
Plan: Finish this quarter.
11. Secret Squirrel Quilt
Started: January 2014
Current Status: Basted and ready to quilt (the picture is a reference to the fabrics only)
Plan: Finish before end of month.
12. Messenger bag 1
13. Messenger bag 2
14. Messenger bag 3
Started: December 2014
Current Status: All 3 cut out
Plan: Finish this quarter.